Title: IDENTIFYING THE MAJOR CAUSES AND OVERALL IMPACTS OF REWORK IN ADDIS ABABA BUILDING CONSTRUCTION PROJECTS
Authors: TSEGAYE, SAMRAWIT
Keywords: Building construction, Project performance
Issue Date: Dec-2019
Publisher: St. Mary's University
Abstract: Rework according to this study is an unnecessary effort of redoing a construction activity that was wrongly carried out the first time. The objectives of this study were, i) To identify the major causes of rework in building construction projects which are located in Addis Ababa, ii) To identify the overall major impacts of rework in building construction projects which are located in Addis Ababa, iii) To give an insight into the financial impact of rework on cost performance of a building project and; iv) To examine the measures taken so far to minimize reworking. From the number of building constructions found in Addis Ababa, building contractors one, two and three were selected as the target population. To meet the objective of the study, a survey strategy followed by a questionnaire, semi-structured interview, and site document review were used as data collection tools. Among the distributed 118 questionnaires for the construction companies, 89 were collected. Based on the collected data, the result of the study revealed that “Change instructions given by the client after some work had been carried out”, “Use of an insufficient skill level manpower” and “Defective workmanship” were the three major causal factors of rework among the 33 identified factors. In addition to this, the study revealed that cost overrun, time overrun and disputes between parties in the contract as the major rework impacts. Besides this, the results obtained from the survey indicated, the rework minimizing measures are not implemented at an efficient level. Finally, the study mainly recommended for the three major participants (contractors, clients, and consultants) to develop a continuous means of communication and specifically for the contractors and consultants to have a rework event, cause and impact recording system which is going to be helpful towards reducing its occurrence.
URI: .
http://hdl.handle.net/123456789/5449
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
Final dissertation.pdf1.22 MBAdobe PDFView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.