Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/7674
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTesfaye, Melaku-
dc.date.accessioned2023-07-03T06:56:42Z-
dc.date.available2023-07-03T06:56:42Z-
dc.date.issued2022-05-
dc.identifier.uri.-
dc.identifier.urihttp://hdl.handle.net/123456789/7674-
dc.description.abstractIn Ethiopian project management, time and cost have been major issues. In general, most projects, particularly in the mining industry, are experiencing time and cost overruns. As a result, doing research in this area was critical in understanding the causes and effects of cost and time overruns in mining projects overseen by the Ministry of Mining of the Federal Democratic Republic of Ethiopia. The purpose of this study is to assess 3 projects in the Ministry of Mining of the Federal Democratic Republic of Ethiopia in terms of time and cost overrun. The study has adopted both quantitative and qualitative research approach. Data on project duration and cost was gathered via a desk review of various Progress Reports and Project Completion Reports. The second phase was used a questionnaire survey were developed to identify and score the effects of time and expense overruns, as well as control measures, using a Likert scale. A total of 50 questionaries were distributed and 100% or 50 questionaries were obtained valid which were used for analysis that shows the existing project time and cost management practices look like in the ministry as well as identifying the main Factors Influencing Time and Cost overrun in mining projects managed by Ethiopian ministry of mining. A related literature review was used to develop a list of factors relevant to the complete study.en_US
dc.language.isoenen_US
dc.publisherST. MARY’S UNIVERSITYen_US
dc.subjectAssessment of project time and cost performance, time overrun, cost overrunen_US
dc.titleASSESSMENT OF PROJECT TIME AND COST OVERRUN: THE CASE OF PROJECTS AT ETHIOPIAN MINISTRY OF MINESen_US
dc.typeThesisen_US
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
melaku Tesfaye St. Mary Thesis.pdf955.75 kBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.