Title: FACTORS AFFECTING FOR ADOPTION OF DESIGN BID BUILD DELIVERY METHOD ON PROJECT TIME AND COST MANAGEMENT IN THE CASE OF SELECTED CONSTRUCTION PROJECTS AT COMMERCIAL BANK OF ETHIOPIA
Authors: DABESA, TIGIST
Keywords: construction,Methodprojects experience
Issue Date: Jul-2024
Publisher: St. Mary’s University
Abstract: The basic factor for the successful completion of a construction project is the proper selection and implementation of project delivery methods to meet project objectives. Therefore the main objective of this research is to determine the factors affecting the adoption of Design Bid Build Delivery Method on Project Time and Cost management in the case of selected construction projects at CBE. In this research descriptive research design was used. Census sampling was also used to determine the population size of the study. The documents reviewed revealed that all of the CBE construction projects experienced time overruns that ranged from 98.2% to 354.8%, and considering price adjustment requests cost overruns ranged from 63.98 % to 400.05% from the agreed contract time and budget. For the data analysis, simple descriptive statistics were used using SPSS software, and the RII was used to determine the relative importance of the factors. The research concluded that the major factors for time overrun due to the adoption of DBB delivery method, from client related side are slow decision making, contract scope change, and financial problems such as delayed payments. From the consultant related side, delayed and slow supervision in making decisions, absence on site, and incomplete documents. For the contractor related, delay in the delivery of materials to the site, a shortage of materials on site, and financial problems. The major factors of cost overrun due to the adoption of DBB delivery method are time delay, Material, machinery, and labor cost increment, and Inaccuracy of material take-off and estimation. Therefore, it is recommended to learn lessons from other projects which are considered as a benchmark to improve the factors that affect the adoption of DBB delivery method on time and cost management
URI: http://hdl.handle.net/123456789/8277
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
TIGIST DABESA FINAL PRINT.pdf1.7 MBAdobe PDFView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.