Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/8278
Title: AN ASSESSMENT OF CONSTRUCTION PROJECT MONITORING AND EVALUATION PRACTICES: IN THE CASE OF AASTU COMMERCIAL COMPLEX BUILDING CONSTRUCTION PROJECT
Authors: Teressa, Tsegaye
Keywords: Monitoring, Evaluation, Project M&E Practices, Project M&E challenges, AASTU Commercial Complex Building and TNT Construction & Trading
Issue Date: Jun-2024
Publisher: St. Mary’s University
Abstract: This study aims to assess the practices and challenges of Monitoring and Evaluation (M&E) in the case of AASTU Commercial Complex Building Construction Project which is undertaken by TNT Construction and Trading which is one of the Grade I GC contractor in Ethiopia. The study applied descriptive research design and used both questionnaires and semi structured interview to gather the data. To analyze the data, both qualitative and quantitative approach were used. The quantitative data were analyzed with the use of SPSS software and RII (Relative Importance Index) of frequencies. The data gathered from the open ended and close ended questions presented in combined way. The sampling method for this study was census. The target population of the study was 35 respondents in number from which the data will be collected. The findings from the key informants interview and M&E process document review of AASTU Commercial Building Construction Project tells that the project M&E system were well organized but it faces lots of challenges during conducting the M&E activity. Some of the challenges that the result shows are M&E implementation strategies and guidelines need regular updates with the scientific management systems, unavailability of data gathering and analyzing tools, project staffs has no positive acceptance on the feedbacks of the M&E team, data auditing is not regularly exercised and difficulty in communicating the results of M&E between employees. In order to improve effectiveness, provide appropriate trainings to all levels of the M&E staff, appropriate technological advancement, and sufficient allocation of funds, adequate top level management support and active stakeholder’s involvement are some of the vital recommendations made in this research.
URI: http://hdl.handle.net/123456789/8278
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
Final - Tsegaye Teressa SGS-0527-2015A - Thesis II APPROVED.pdf986.93 kBAdobe PDFView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.